How Much Concrete for a 10x12 Slab? (Bags & Yards)

Quick answer: a 10 × 12 slab needs between 1.48 and 2.22 cubic yards at 4–6 inches thick, before adding waste.

A 10 × 12 slab covers 120 square feet. That makes it a useful size for a patio, workshop, or larger outdoor living area. The final order depends on the slab thickness, the unevenness of the base, and whether you choose bagged concrete or a ready-mix delivery.

10 × 12 slab concrete table

ThicknessCubic yards60 lb bags80 lb bagsEstimated material cost
4 in1.488967$467–$436 bagged / $244 ready-mix
5 in1.8511284$588–$546 bagged / $306 ready-mix
6 in2.22134100$704–$650 bagged / $367 ready-mix
TRY THE NUMBERS LIVE

Change the thickness or waste allowance to see this 10 × 12 ft example update.

What this slab size is commonly used for

This footprint is commonly considered for a patio, workshop, or larger outdoor living area. Before ordering, confirm the finished dimensions after forms are installed. A base that is not level can change the amount needed, and thickened edges or footings are separate from the flat slab calculation. If the project includes a curb, steps, thickened perimeter, or isolated pads, calculate those volumes separately and add them to the order.

When to use ready-mix

Bagged concrete can be practical for small pours, repairs, and locations where a truck cannot reach. As the number of bags rises, mixing, moving, and placing the material becomes a major part of the job. Ready-mix is usually worth comparing for a slab this size when the pour must stay continuous, the site has delivery access, or the finish window is short. Ask the supplier about minimum loads, delivery fees, slump, and the strength specification required for your use.

How much waste should I add?

Ten percent is a reasonable planning allowance for many straightforward forms. Increase it when the excavation is irregular, the subbase is uneven, or access makes a second delivery difficult. The live calculator above recalculates the bag and yard estimate when you change thickness or waste.

Frequently asked questions

Does this include rebar or mesh?

No. Reinforcement, base gravel, vapor barrier, forms, delivery, labor, and finishing supplies are separate from the concrete volume.

Should I order exactly the calculated amount?

Use the table as an estimate, then confirm the final quantity with your supplier using the actual product yield and your site measurements.